Dust removal in temperature and humidity Test Chamber (2/2)
Published: |
May 21, 2019 |
Author: |
Climatest Symor |
Abstract: |
Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].... |
You must be a registered user to talk back to us. |
Company Information:
More articles from Symor Instrument Equipment Co.,Ltd »
- Dec 16, 2019 - Factors determine the price of temperature humidity test chamber
- Dec 13, 2019 - Difference between Neutral and Acid Salt Spray Corrosion Test
- Dec 12, 2019 - What causes temperature humidity chamber to alarm?
- Nov 20, 2019 - Why salt spray chamber fail to spray salt mist?
- Nov 17, 2019 - Maintenance and operation of walk-in temperature humidity test chamber
- See all SMT / PCB technical articles from Symor Instrument Equipment Co.,Ltd »
More SMT / PCB assembly technical articles »
- Apr 11, 2022 - iNEMI Webinar 07.07.2021 - PCB Cleaning | ZESTRON Americas
- Jan 28, 2022 - Open Radio Unit White Box 5G | Whizz Systems
- Nov 10, 2021 - Understanding the Cleaning Process for Automatic Stencil Printers | ITW EAE
- Oct 20, 2021 - PCB Surface Finishes & The Cleaning Process - A Compatibility Study | ZESTRON Americas
- Oct 06, 2021 - Cleaning Before Conformal Coating | ZESTRON Americas
- Browse Technical Library »
Dust removal in temperature and humidity Test Chamber (2/2) article has been viewed 258 times