Taking the LED Pick and Place Challenge

Published:

September 25, 2014

Author:

Joshua J. Markle.

Abstract:

For the past few years there has been a shift in the Lighting Industry that has carried over to the surface mount technology assembly line. What is this shift you may ask? Well it is the LED revolution. This revolution or change in lighting has some very promising results already in practice and many more companies looking to implement the LED technology into their product portfolio's. With a number of companies looking to expand their portfolio to include LED fixtures there has been an increase in the number of companies that have started their own SMT lines, as well as a significant number of contract manufacturers to meet this new industries demands (...)

This presentation will discuss some issues in the pick and place process for LEDs and presents a method to troubleshoot and resolve these issues....

  • Download Taking the LED Pick and Place Challenge article
  • To read this article you need to have Adobe PDF installed

October 14, 2014

If I can add a suggestion. Increasing the machines "blow off" helps with the release of component and disabling any type of auto pickup location teach. Great article.

March 2, 2017

I have cooled the LED's before placing, like in a refrigerator. I also have the polyurethane tips on my nozzles. Would suggest getting the "castellated" tip though.

You must be a registered user to talk back to us.

 

Company Information:

Cree is a market leader in LED chips, power LEDs, LED backlighting, power switching and wireless communications devices.

Durham, North Carolina, USA

Manufacturer's Representative

  • Phone 919.313.5300
  • Fax 919.313.5453

See Company Website »

Company Postings:

(2) technical library articles

(1) news release

  • Apr 11, 2022 - iNEMI Webinar 07.07.2021 - PCB Cleaning | ZESTRON Americas
  • Jan 28, 2022 - Open Radio Unit White Box 5G | Whizz Systems
  • Nov 10, 2021 - Understanding the Cleaning Process for Automatic Stencil Printers | ITW EAE
  • Oct 20, 2021 - PCB Surface Finishes & The Cleaning Process - A Compatibility Study | ZESTRON Americas
  • Oct 06, 2021 - Cleaning Before Conformal Coating | ZESTRON Americas
  • Browse Technical Library »

Taking the LED Pick and Place Challenge article has been viewed 601 times

SMT spare parts - Qinyi Electronics

Sell Your Used SMT & Test Equipment