BGA Placement on Rework Station

Published:

June 12, 2019

Author:

ACI Technologies, Inc.

Abstract:

The success of ball grid array (BGA) placement on electronic assemblies is as much a matter of proper preparation and planning, as it is technique. In some designs, it is more appropriate to apply BGAs using a rework station that isolates the placement of the device, without subjecting the entire assembly to thermal reflow. This is especially beneficial in board constructions where the number of BGAs is limited, and the application of the solder paste is difficult, due to small pitch features that stretch the limitation of the stencil construction. Another application for rework stations, involves very large and thermally conductive BGAs, which will not uniformly reflow with other components on the assembly, and may require special process parameters for their proper placement. The most common use of BGA rework stations are for assemblies requiring BGA removal and replacements due to failures in the initial assembly stage....

  • Download BGA Placement on Rework Station article
  • To read this article you need to have Adobe PDF installed

You must be a registered user to talk back to us.

 

Company Information:

ACI, an authorized IPC Training Center operating the National Electronics Manufacturing Center of Excellence providing analytical testing, manufacturing and repair services to the electronics industry.

Philadelphia, Pennsylvania, USA

Consultant / Service Provider, Standards Setting / Certification, Training Provider

  • Phone 610 362 1200
  • Fax 610 362 1290

See ACI Website »

Company Postings:

(24) products in the catalog

(1) upcoming training course

(63) technical library articles

(2) news releases

  • Apr 11, 2022 - iNEMI Webinar 07.07.2021 - PCB Cleaning | ZESTRON Americas
  • Jan 28, 2022 - Open Radio Unit White Box 5G | Whizz Systems
  • Nov 10, 2021 - Understanding the Cleaning Process for Automatic Stencil Printers | ITW EAE
  • Oct 20, 2021 - PCB Surface Finishes & The Cleaning Process - A Compatibility Study | ZESTRON Americas
  • Oct 06, 2021 - Cleaning Before Conformal Coating | ZESTRON Americas
  • Browse Technical Library »

BGA Placement on Rework Station article has been viewed 484 times

SMT feeders

Industry 4.0 Reflow Oven